| 服務日期 | lifting CE服務內容 |
Applicant: CORETRONIC CORP UL Assumption: Quotation does not include fees associated with travel, lodging, meals, etc. Quotation does not include fees associated with Safety Certificates for other countries. No alternate components are employed. Each line item above is a separate phase of the Service(s) and is optional and independent of the completion of the previous phase(s). Your written acceptance will be required to proceed to the next phase(s) of the Service(s) and each phase will be governed by this Quotation and the referenced terms and conditions. Final certification, if applicable, is contingent on the successful completion of all phases and compliance with UL Requirements. This Quote anticipates that all requested information and/or samples necessary to proceed with the evaluation will be available within 60 days from the time they have been requested. This Quote includes the cost of a predetermined set of testing. In the event of testing nonconformance, a summary of the testing results and cost for the additional evaluation will be provided. A separate project may be issued to cover the retesting. Additional cost will be required for any change of scope and/or rework, once the project is established. This quotation includes representative testing in order to provide a lower project cost limit and reduce sample requirements. Upon completion of the Phase 1 – Construction Review/Pre-Testing, if it is determined additional testing is required, additional costs may be necessary. Where testing is conducted at Lab outside UL, the client is required to cover the charges for Lab either on their own or as an additional charge above the cost limit. This quote excludes costs or fees associated with services of outside contractors or test facilities and certain special equipment charges. Completion time assumes that the outside contractor and test facilities, when necessary, will be available within the timeframe allotted. In accordance with UL's Data Acceptance Program (DAP), UL retains the right to request that a test or test program be repeated at UL or under UL witness after review of submitted data. Additional charges may apply. All test equipment utilized during a factory visit that is provided by the client must have the proper calibration certificates submitted for review and verified for compliance prior to the arrival of the project handler. Please visit http://services.ul.com/service/data-acceptance-program/ for essential information related to witnessing testing at your facility and/or data acceptance issues. Devices or materials utilized for testing and/or certification must be UL Certified and bear the appropriate UL Mark, while meeting the requirements outlined in the product standard being used for this evaluation. Any device or material that does not conform to these requirements may be subject to additional evaluation, prior to being utilized for testing in this project. Assumes the client can provide a sample(s) of each (Model AC F2-T Series & AC F2-D Series) unit for evaluation purposes. Assumes the client can provide adequate samples to complete all testing required at client's site. Assumes the client can provided the necessary connections to allow us to function the controller as it is intended in the end use application. Assumes the following tests to be conducted: 1.) Input Test – Components(Conduct both at DC and AC application) Assumes we will test a model from the AC F2-T Series and a model from the AC F2-D Series to represent all models. Assumes Model AC F2-T 48-240-240 will be tested and used to represent the AC F2-T (Pump) Series. Assumes Model AC F2-D 48-240 will be tested and used to represent the AC F2-D (Traction) Series. Assumes no unlisted component evaluations. TAT: 4-10 weeks Best Regards, Lori Chen Energy & Power Technologies Division |
|
| 2021/1/26 |
|
| 2021/1/28 |
|